Resume of Senior Project Manager




Title
Senior Project Manager

Primary Skills
Visual Basic, Pascal, C BRIO, MS Project,, SQL

Location
US-CA-San Diego

Posted
Jun-15-07

RESUME DETAILS

SR. PROJECT MANAGER AND BUSINESS PROCESS DESIGNER

SUMMARY
-13 years experience in the development and implementation of integrated systems in positions of increasing responsibility and scope from software programming to management.
-10 years experience in business process reengineering.
-Successfully deployed and supported software, hardware, and socio-tech systems to introduce new services, realize up to $10M in direct savings annually, and significantly improve operational performance.
-Extensive experience in project management, design, requirements definition and specification, budgeting and control, and restructuring of organizations.

TECHNICAL PROFICIENCY
STANDARDS: BPEL4WS (OASIS), WS-CDL (W3C), BPML, UML, CMM
BPM TOOLS: Oracle BPEL Process Manager, ActiveBpel, IDS Scheer ARIS, Corticon Business Rules Management toolset, Xenos GoXML, Altera MapForce, Vitria BusinessWare
LANGUAGES: C++, Visual C++, C, Visual Basic, Pascal, Fortran, Turing, XML, tcl, Dev Tools: MS Visual C++ 6.0, WinCVS, Easycode, Eclipse IDE
OSS: Windows, OS/2, SunOS, DEC MicroVax, VMS, HPUX
BUSINESS SOFTWARE: Crystal Info & Reports, BRIO, Mathematica, Lotus Notes
PROJECT MANAGEMENT: MS Project, PMBoK
DATABASES: SQL, Oracle 7.2 / 8.1, SQL Server, DB2

WORK EXPERIENCE

WEB SERVICES COMPANY (CONFIDENTIAL)
Silicon Valley, USA / Ontario, California
05.2003 - Present

PRINCIPAL PROJECT MANAGER AND BUSINESS PROCESS DESIGNER
-Principal Project Manager and Business Process Designer for a new venture interested in entering the web-services business-process market.
-Developed an architecture for implementing business processes, which guarantees information quality (within certain set parameters) though use of control theory.
-Developed an architecture for executing rule-bases which maximizes process flexibility.
-Established design pattern knowledgebase.
-Represent venture on OASIS BPEL4WS standards setting body.

CLASSICAL COMMUNICATIONS GROUP
Santa Clara, CA, USA
06.2000 - 01.2003

MANAGER SOFTWARE ENGINEERING - SYSTEMS ENGINEERING
-Created a cross-functional team responsible for providing engineering-level support, creating requirements definitions, and developing improvements to the company's Operational Systems Support software (OSS).
-Led over 40 projects of varying sizes simultaneously.
-Started and ran the corporate Information Quality (a.k.a. Data Integrity) project management office, which was profiled at the IQ2003 convention in San Diego, with over 1 500 000 primary source records repaired, and 90 related modifications made to the OSS.
-Consolidated, streamlined and automated the software engineering request process (for new feature, enhancement, bug, and support processes) onto the Remedy ARTS platform.
-Initiated redesign of Org structure to facilitate better workflow and improve utilization of the OSS.
-Designed and coded the corporate network capacity-management forecasting system.
ACHIEVEMENTS:
***Over $20 million dollars in cost savings through various initiatives.
** First "true-requirements" specification and zero-bug implementation for a software enhancement.
** Operations organization reduced their headcount by 15% due to our initiatives.
** Handled over 6000 support requests per year, with 76% resolved in under 2 hrs, and 98% resolved within 8 hrs - a 2000% improvement over the initial performance level.
** Earned extremely high internal customer satisfaction score for an engineering team: >85% delighted.

CALLANDRIA INC.
North York, Canada
06.1995 - 05.2000

MANAGER SITE MANUFACTURING TECHNICAL SERVICES (1998-2000)
-Managed centralized Computer Integrated Manufacturing (CIM) team including SMT, automated inspection and automated rework engineers and programmers. Started 2nd team for a site-wide training initiative. Group grew in size to 34 staff and 5 team leaders.
-Led multi-prong initiative to migrate to automated CIM systems:
**Reengineered the new-product introduction process and new-product data supply-chain.
** Created new component database holding manufacturing parametric data against vendor part numbers. Design sold to Valor and became the basis for the Valor Parts Library.
** Improved offline programming of equipment for a further 40% reduction in line downtime for new product set-up and changeover.
** Standardized data formats to facilitate products transfers between sites
** Created tools to reduce materials setup time through bar-code labeling of lots on production floor and tracking though central database. Kitting time reduced by 70%.
** Developed activity-based tracking system to bill departments based on usage of CIM team
-Defined vision for new on-the-job technical training team, setup supporting infrastructure and training materials, negotiated rights for the use of training materials with vendors, and rolled out training strategy to a site of 8000 people.
** Led development and migration to a new corporate training record system, skills database, career-path management and succession planning system.
** Introduced an integrated data reporting system using Crystal BI tools.
** Co-founded an internal training alliance for pursuing the coordinated development and utilization of training materials throughout the corporation.
** Attained first accreditation as an IPC Certification Center in the EMS industry.
-Piloted new statistical process control tools, and participated in corporate evaluation of new CIM tools.
COMPUTER INTEGRATED MANUFACTURING (CIM) TEAM LEADER (1995 - 1997)
Formed and led a team of 16 individuals (10 production; 6 engineers)
-responsible for the development and implementation of software tools for placement equipment on 27 SMT lines.
-Implemented business process and socio-tech reengineering, resulting in:
** $6M dollars in direct savings each year by reducing on-line debug of equipment by over 98%, and by allowing line staffing to be reduced by 50%.
** Significantly reduced the cost of building low-volume products and prototypes in short batch runs, by reducing changeover and debug times.
-Specified and sourced software and hardware solutions for CIM systems software (commercial and proprietary) and a materials specification database (proprietary).
-Ancillary responsibility: ISO 9000 representative and auditor for engineering; developed department quality training manual covering concepts and practices.

CASTLES IN THE SKY INC.
Toronto, Canada
12.1993 - 07.1994

SENIOR SOFTWARE ENGINEER
A software production start-up producing multimedia and E-commerce products.
-Designed and developed VR WORKSHOP, a design animation product for novices; finalist of Multimedia World Magazine's 1995 Reader's Choice awards.
-Negotiated rights to software, demos, and animated videos of other vendors' products, which were incorporated into our product.

CIMLAB @ UNIVERSITY OF OREGON
Toronto, Canada
08.1991 - 06.1993

RESEARCH ASSISTANT
-Developed software for optimizing and controlling the assembly operations of automated production environments.
-Developed artificial intelligence software, based upon deep-level modeling techniques to provide real-time automated fault diagnosis of a manufacturing system.

KLAUSS INDUSTRIEOFENBAU
GmbH Linz, Austria
05.1988 - 08.1991

SCIENTIFIC ANALYST AND SOFTWARE DEVELOPER (CAE GROUP)
-Developed a computer model for determining the thermal profile of the contents of a high-convection industrial furnace over the duration of its heating and cooling cycle.
-Developed GUI for a furnace facility control system.

EDUCATION
Master (MS) In Mechanical Engineering (Dual Supervisor with Elec. Eng)
Thesis: A Hybrid Supervisory Control System for Flexible Manufacturing
Workcells (Based upon Discrete-Event Systems), University of Toronto,
Toronto, Canada, 1991-93

Bachelor (BS) In Engineering Science (Manufacturing Systems
Engineering option) Thesis: Comparative Study of Filtering Algorithms
with Applications to Printed Circuit Board Inspection, University of
Toronto, Toronto, Canada, 1984-88

PROFESSIONAL MEMBERSHIPS/ LECTURING
-OASIS (TC member)
-International Association for Information and Data Quality (IAIDQ)
-Association for Computing Machinery (ACM)
-Project Management Institute (PMI)
-2003 Information Management Conference: A Methodology for Improving Information Quality
-1999 Project Management Symposium (Toronto): Change Management
-1994 - 2000 Guest lecturer at the University of Toronto

LANGUAGES
-English, German, French


KEYWORDS.. Integration, implementation, business process management, business intelligence, soa, service oriented architecture, soap, business process markup language, bpel, bpel4ws, business process execution language, re-engineering, loosely coupled, loosely-coupled, edi, edifact, h7, hipaa, swift, x12, web services, bpml, unified modeling language, project management institute, project management body of knowledge, socio tech, sociotech, redesign, restructure, business process management, business process measurement, data integrity, information quality, six sigma, continuous process improvement, poke yoke, lean manufacturing, world class, kanban, cycle-time, tact time, kaizen, lead sigma, lean office, optimize, business process execution language, business process execution language for web services, websphere, business process management initiative, workflow management coalition, Microsoft project, primavera, MES, manufacturing execution system, Valor, Trilogy, Valor Trilogy, Panapro, Panacim, X-ray
inspection, visual inspection, automated rework, smt, assembly, oem, contract electronics manufacturing, ems, netcracker, operations support software, oss, weblogic, bea weblogic, bea, action request system, remedy 5.0, remedy 5.5, configuration management system, bug tracking system, cms, crm, sla, sfa, test plan, liaison, negotiate, CAD/CAM, CAD, CAM, documentation, materials supply chain, optimize, optimize, abc, bar code, set up, changeover, production scheduling, total quality management, tqm, quality management, spc, statistical process control, association connecting electronics industries, iso 9001, iso 9001: 2000, 3d, virtual reality, multimedia, automata, control systems, controllability, concurrence, concurrency, hierarchies, discrete event systems, controllable, reachable, natural language, conflict, static analysis, simulation, synchronous product, synchronous, supervisor, supervisory control,
synthesis, language inclusion. Graphic user interface, circuit assembly magazine, change management.Cmm capability maturity model refactoring re-factoring

Certifications
See above

CONTACT DETAILS

You must be logged in and have a current resume access subscription. Login or Register »


View all resumes in US-CA-San Diego »
View all resumes in US-CA »

View other Senior Project Manager resumes, IT Manager resumes